Dialog Semiconductor

Size: 6,000 sq.ft
Location: Swindon

As space was becoming a premium on the ground floor to accommodate their support and lab teams, Dialog Semiconductor acquired the lease on the first floor of their current building.  Having fitted out their ground floor in September 2009 when Dialog Semiconductor originally relocated to Delta 200, Interaction was delighted when appointed to assist in the fit out of their new first floor.

In order to make the best use of Dialog Semiconductor’s revised sq. footage, the decision was taken to relocate the support teams up on to the first floor, allowing for expansion of the lab’ teams on the ground floor.

Installed within the 6,133 sq ft first floor space is a light and airy open plan office with a collaborative meeting area, a conference room with ‘SMART board’ and latest AV technology, an ‘idea wall’ and a moveable wall adjoining the neighbouring meeting room, a meeting suite – with each room containing their own ‘idea wall’ and AV capability, a storage wall, a bright teapoint and a first aid room.

The end result is a modern, fresh and clean environment, with emphasis on functionality through design.  The client is as enthralled with the outcome as we are.